Exfo FTB-8500 Series for FTB-200 Manual do Utilizador Página 78

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 77
Creating and Starting a Test Case
64 FTB-8500 Series and FTB-8120NGE/8130NGE
Introducing the Test Setup
The test path is created through the configuration of each layer that must
be crossed by the signal under test. The test path can contain the following
nodes depending on the test application type:
For FTB-8510B:
For FTB-8510G:
For FTB-8120NGE/FTB-8130NGE and FTB-8525/FTB-8535:
Vista de página 77
1 2 ... 73 74 75 76 77 78 79 80 81 82 83 ... 512 513

Comentários a estes Manuais

Sem comentários