
Testing Multiple DUTs with the LabVIEW Application
DWDM Passive Component Test System 119
Opening an Existing Test Database
Opening an Existing Test Database
Previous tests can be loaded for on-screen viewing, printing and exporting.
To open an existing test database:
1. Select View from the File menu of the main window.
2. Select the test to open. Click Open.
3. The information is automatically loaded into the main window.
Note: The DUT Connectivity and Acquisition Settings tabs are not available in
view mode. Also, System menu and System Info from the Help menu are
not available. To view the DUT connectivity, use the export tool (see
Exporting Test Results on page 136) or the graph settings tool (see
Adjusting Result Settings on page 134).
Comentários a estes Manuais