Exfo IQS-12004B DWDM Passive Component Test System for Manual do Utilizador Página 80

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 79
Operating the DWDM Passive Component Test System
68 IQS-12004B
Connecting DUT and Modules
You can click List or press F12 to see a detailed list of required connections
(as shown below). This list shows you which DUT output port must be
connected to which port on the power meters. Basically, channel 1 of the
device is connected to channel 1 of the first power meter, channel 2 to the
second channel of the first power meter, and so on.
Once all connections have been made, click OK to start the measurement.
The system will sweep the source, transfer the data, and analyze the results
in accordance with the parameters selected in the Setup window.
IMPORTANT
Before running any test, ensure that all the connectors and
fiber-optic adapters (FOAs) to be used are clean, and that all
fiber-optic light source warmup periods have been respected.
Vista de página 79
1 2 ... 75 76 77 78 79 80 81 82 83 84 85 ... 436 437

Comentários a estes Manuais

Sem comentários