Using the Power Meter Linearity Verification Tool
150 IQS-12004B
The following diagram illustrates the steps of a typical linearity verification
sequence that can be performed with the tool.
Test power meter (DUT)
Initialize hardware
Select DUT and reference power meter
R
e
p
e
a
t
f
o
r
e
a
c
h
c
h
a
n
n
e
l
Measure linearity on a specific channel
Retrieve results
R
e
p
e
a
t
f
o
r
e
a
c
h
p
o
w
e
r
m
e
t
e
r
t
o
b
e
t
e
s
t
e
d
Set up acquisition parameters
Null power meters